2012 Moon - under repair and rebuilding  
StartMeny Album MiniAlbum Previous Next
To get to one side of the shaft for the centreboard we had to cut a hole through a thin layer of fibre.

Under the fibre is a "bow thruster tunnel" into the bearing for the shaft.

The port side of the shaft is accessable from under a lid in the floor inside the boat.